LEE CENTER, N.Y. A proposed water district is putting a household-budget question before part of the Town of Lee: what will a new water system cost, and what will residents get in return? This is crucial for understanding the Lee water district vote.
The town’s official notice confirms a special election on establishing Water District No. 2 for Tuesday, Nov. 3, at Lee Town Hall. This is a separate water-district election. Readers should not assume it is a question on their regular general-election ballot.
The upcoming Lee water district vote is important for all residents.

A $21.6 million proposal draws cost concerns
The Daily Sentinel reported Oct. 21 that residents questioned the $21.6 million project during an information session that evening. Nearly 450 properties would be affected.
Engineer Jack Dodson described the proposal as a way to provide reliable, regulated drinking water in southwestern Lee, according to the Sentinel. He pointed to risks facing private wells and water-system challenges at mobile home parks. Some residents remained unconvinced about the project’s costs and the information they had received.
The newspaper reported Dodson’s estimate of $950 a year for a typical household, with district property owners paying even if they do not connect. That is a reported estimate, not a guaranteed final bill.
Dodson also said grants would need to be secured before the project could move ahead, the Sentinel reported. The timeline presented at the meeting aimed for completion in June 2029. A favorable vote would therefore not mean immediate construction or water service.
What does the household estimate include?
The public town notice reviewed for this story does not provide a cost breakdown. The Phoenix has not independently verified whether the reported annual estimate includes every charge a household could face.

Before treating that number as a complete budget, property owners should seek written answers to several practical questions:
- How much of the annual charge would repay construction debt, and how much would cover operating the system?
- Would water use be billed separately?
- Would connecting a home require an additional fee or plumbing work paid by the owner?
- What would the cost be if expected grants are smaller than hoped, or are not awarded?
- How would charges differ among homes, vacant lots, businesses and rental properties?
These are questions to resolve, not findings that any particular extra fee has been imposed. A written estimate tied to an individual property would be more useful than assuming every owner will receive the same bill.
Check the special-election rules before going
The town lists its address as 5808 Stokes Lee Center Road, Lee Center. Its homepage confirms the election date and location but does not spell out voter eligibility or polling hours in that notice.
Residents should verify whether their property is inside the proposed district, whether they qualify to vote, what documentation is needed and when polls will be open. Do not assume that living elsewhere in Lee or being registered for the general election makes someone eligible for this separate vote.
The town’s published clerk contact number is 315-336-3438. Ask for the official special-election notice, district boundary map and current written cost estimate before making a voting plan.
Reporting note: Meeting details above are attributed to the Daily Sentinel. The town independently confirms the Nov. 3 special election. Final charges, funding and detailed election rules still need confirmation.